ITWS Software Engineering Support

The Norman Oklahoma Doppler Radar Installation, photo courtesy of the National Oceanic and Atmospheric Administration/Department of Commerce.The ITWS (Integrated Terminal Weather System) provides terminal aviation system users with current weather information and 30 minute advance forecasts by integrating data products from the FAA and the National Weather Service sensors (e.g. Doppler radars and NEXRAD).

The ITWS Program Office looks to Genco Systems Engineers for IV&V and Software Engineering needs. Our Engineers provide the ITWS Program Office with evaluations and recommendations to make the procurement successful.

The FAA and TRW, both have recognized GENCO's outstanding level of support on the ITWS Projects. The IV&V and Software Engineering activities of the ITWS Program which Genco is currently supporting include but are not limited to the activities below.

Some Of Our Specific IV&V Activities for the ITWS Project

bullet  Perform detailed evaluations of the contractor's proposals for engineering and production contracts. Prepare the Government's position for negotiations and support the negotiation process.

bullet  Evaluation of development contractor's plans (Software Development Plan, Configuration Management Plan, Program Plan, Quality Assurance Plan Risk Assessment and Risk Abatement Plan, and Master Test Plan).

bullet  Evaluation of development contractor's periodic Contract Deliverable Items (CDRL), such as Software Management Indicator Report, Program Status Report and Network Logic Schedule.

Software evaluation at specific phases can keep a project on budget and schedule.bullet  Evaluation of software related documents for each phase. Documents detailing: Requirement Phase, Preliminary Design Phase, Detailed Design Phase, Code and Unit Testing Phase, Software Integration Phase and System Integration Phase, Operation and Maintenance Phase. All of these documents are an important part of the program life-cycle. Upon review Genco provides recommendations to the Program Office.

Top of Page

bullet  Genco performs traceability analysis from system requirements to software requirements, then to preliminary design and to detailed design and finally to code. Provide statistical results/graphs to the Program Office regarding the outcome of the analysis results.

bullet  Perform on-site evaluation of software development folders and provides informal feedback to the contractor to resolve issues before the documents are formally delivered.

bullet  Support the formal reviews including Systems Requirement Review (SRR), Software Requirement Review (SRR), Preliminary Design Review (PDR), Critical Design Review (CDR), Program Management Review (PMR) and Technical Interchange Meetings (TIM). Provide a trip report indicating observations, evaluations, and recommendations to the Program Office.

bullet  Support Functional Configuration Audit (FCA) and Physical Configuration Audit (PCA).

bullet  Provide evaluation and support to the ITWS Test Program, including monitoring of selected test activities of the contractor (e.g. unit testing, integration testing, system factory acceptance testing, and site acceptance testing).

bullet  Provide management support regarding the quality control of the IV&V findings, planning, reporting, and coordinating with other project entities, and prepare quality process initiatives input.

bullet  Support the ITWS Team in resolving all software related issues.

bullet  Collect Software Trouble Reports (STRs) from the contractor's defects tracking system and maintain the database in Microsoft Access for the ITWS Team's use. Provide periodic reports to the Program Office for constant monitoring of the Project's health.

bullet  Support the Configuration Control Board (CCB) Process to monitor the enhancements and modification to ITWS software.

bullet  Support the budget process for estimating costs for the proposed new capabilities.

Top of Page
Return to Project Listing


 
Home bar About bar Capabilities bar Clients bar Contact bar Employment
GSA Schedules bar IV & V bar Mission bar Projects bar Services bar Site Map

info@GencoSystems.com
© 2002- GENCO SYSTEMS. All Rights Reserved.
Comments or bugs? Contact the Webmaster